Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

3. When did Leo Szilard patent his idea of a nuclear chain reaction? A. 1954 B. 1943 C. 1945 D. 1934 pls answer due tmr
Compare the Silk Road with the Great Wall of China as symbols of Chinese foreign policy
PLEASE HELP!! The table shows the mass and boiling point of some substances.( I attached a picture of the table )Part 1: Is the value of M less than, greater th
Please Help Me =) ----------------------------
A physical map uses to indicate elevation and features
A school attendance clerk wants to determine if there is a relationship between the number of times a student arrives to school late and the distance the studen
The temperature rose from 40°F to 60°F. What was the percent of increase?
If PA = 6, PD = 4 and BE = 5. Find PE A) 4 B) 5 C) 6
A cylinder has a volume of 288 pie cubic meters and a height of 9 meters. What is the area of the base?
what is greater..? 9.92 , 9.82 , 9.83 or 9.81 ?