kadenceclay26
kadenceclay26 kadenceclay26
  • 03-10-2016
  • Mathematics
contestada

a contractor's crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

charstar
charstar charstar
  • 03-10-2016
54/3=18

hope this helps :)
Answer Link

Otras preguntas

Cultural factors sometimes can be political and economic factors when working or living in a foreign country. A) easier to understand than B) similar to c) more
One form of interference with satellite transmission is called raindrop attenuation in which the transmissions are absorbed by heavy rain. True False
Select two statements that are true about the equation y+4=-8(x-2)
Ankylosing spondylitis causes a. temporomandibular joint degeneration. b. costal cartilage degeneration. c. intervertebral joint fusion. d. instability of synov
How is the mean of the distribution of sample means related to the population mean of the number of cancer spots?
hiw is Apple planning on returning to the music business​
How is the diffusion different in a small flat cell and a large round cell
At this appliance store, the monthly sales were $52,900 in May and $78,300 in June. What is the percent increase in the sales from May to June, rounded to the n
What is the value of f(−1) when f(x) = 2x + 2?
what is the general term for the polymers of proteins​