if it takes 4 workers 6 hours to paint a fence, how long would it take 8 workers

Respuesta :

tristonanderson38
tristonanderson38 tristonanderson38
  • 04-02-2021

Answer:

3 workers

Step-by-step explanation:

just divide by 2

Answer Link
snuddy0809
snuddy0809 snuddy0809
  • 04-02-2021
It would take 8 workers 3 hours
Answer Link

Otras preguntas

it is said that the protoplasm cannat be analysed chemically.Why?
the first factor in determining how advertisement should be designed
What type of sentence is "Good morning to the world"?
How many milliliters of water are in each 7 beakers
scan the following book titles which one Would you expect to focus on the adventures of a guide dog for the blind? a.)fast and simple dog Training b.)moving t
Can water boil at 0°?
Gus is painting his house. he use per 2 quarts of paint p hour Gus paints for 8 hours. how many gallons of paint did he use.explain
Dominic and Stacy each have a stamp collection. Dominic has six fewer stamps than three times the number of stamps Stacy has. Dominic and Stacy decide to give a
what is a popular pastime for knights
What does the structure of the poem as the outspread wings of a flying bird convey? in the poem easter wings