In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

Whose motto was Share Our Wealth?
Write 3 strategies you can use when you become impatient.
Which star color indicates the hottest star surface temperature
what is rhe sum of 4 5/6 3 5/6
the flower shape allows the bird to aid which process required for plant survival
Tyson has 1/2 pound of raisins to divide equally into 7 different bags what fraction of pound will be in each nah?
The person who receives the message is called
Which of the following would increase the conductivity of a connecting wire? (More than one answer). A) increase the diameter B) increase the length of the wir
Use the guess-and-check method to solve the equation: 5(x + 2) + 1 = 26 A. x = 2 B. x = 3 C. x = 4 D. x = 5
Por favor, _____ Ud. las chuletas de cerdo con estos _____. A. dé, sabores B. sirvan, sabores C. traiga, suelos D. sirva, frijoles