if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

Sammy likes to mix and match her 4 necklaces, 2 bracelets, and 3 hats. The colors are listed in the table. On monday, she randomly picks a bracelet, a necklace,
Which of the following should be considered last when searching for financing?A. Family membersB. BanksC. Commercial finance companiesD. Credit cards​
what is cost leadership​
At what stage of a trial does a defendant plead guilty or not guilty? bond hearing arraignment sentencing jury selection
What is 3 3/4 ft = in yd?
What best describes the expression 5 over y? 5 times some number 5 minus some number 5 divided by some number 5 more than some number
Which describes the transition from one scale to another in the same piece of music? A) Modulation B) No cable C) Key signature or D) Call and response
38 POINTS!!! PLZ HELP FAST!!!! Which kind of abuse is described as the failure to meet the basic physical and emotional needs of a person? A. basic abuse B. n
I need help please?!!!!):
What is the term for a loan with a cosigner?A. An automobile loanB. A guaranteed loanC. A consignment loanD. A contractual loan​