ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

Find the slope of the line that passes through (7,2) and (9,5)
Find the slope of the line that passes through (7,2) and (9,5)
Which expression is equivalent to the expression represented by the verbal phrase? 25% of the quantity of 208 plus n A. n + 5,200 B. 25n + 5,200 C. n + 52 D
2.65 g of sodium carbonate was dissolved in water and made up to 500 ml in a standard flask. 20 ml portions of this solution required 18.50 ml of a solution of
Which among the following are solution of the equation 2x+3y=8 a) x=0,y=5 b) x=3,y=2 c) x=-5,y=6 d) x=-1,y=-2​
(a) antawn, the team's starting quarterback, has a head circumference of 22.4 inches. what is antawn's percentile? (b) find the head circumference of the player
The ________ is the idea or concept that ancient life forms succeeded each other in a definite, evolutionary pattern and that the contained assemblage of fossil
What are all of the components that make up galaxies bound by? A. Dark energy B. Dark matter C. Gravity D. Redshift
Which renewable energy source is used most?
standard precautions differ from transmission-based precautions in that standard precautions